Weekly production schedule

TOEIC · Reading · hard

Read the text and answer the questions. Questions 1-4 refer to the following schedule.

Vertex Engineering – Weekly Production Schedule, Line 3 This schedule shows planned production for Line 3 for the week of September 8. All times assume the line is running without interruption; any unplanned downtime will be added to the following day's total. Monday and Tuesday: Producing Model A-200 brackets, target of 1,200 units per day, running two shifts. Wednesday: Line maintenance in the morning, no production before 1:00 p.m. Afternoon shift will switch to Model B-450 brackets. Thursday and Friday: Continuing Model B-450 production, target of 900 units per day due to a slower assembly process for this model. Any orders for Model A-200 placed after Tuesday will not be produced until the following week, since the line will not switch back to that model before Monday.

What happens on Wednesday morning?

  • Model A-200 production continues
  • The line switches to Model B-450
  • A double shift is added
  • The line undergoes maintenance

What can be inferred about orders for Model A-200 placed on Wednesday?

  • They will not be produced until the following week
  • They will be produced that same afternoon
  • They will be canceled automatically
  • They will be produced on Line 3's night shift

Why is the daily target lower for Model B-450 than for Model A-200?

  • Fewer workers are assigned to Model B-450
  • Model B-450 has a slower assembly process
  • Model B-450 requires imported parts
  • Model B-450 is produced on a different line

What happens to unplanned downtime, according to the schedule?

  • It is ignored in the weekly total
  • It cancels the day's production entirely
  • It is added to the following day's total
  • It is made up on the weekend